| 03/28/2012 - ROUTINE-INSPECTION |
| 10/06/2011 - ROUTINE-INSPECTION |
| 04/08/2011 - ROUTINE-INSPECTION |
| 12/02/2010 - ROUTINE-INSPECTION |
| 06/04/2010 - FOOD SECOND FOLLOWUP INSPECTION |
| 06/02/2010 - FOLLOWUP INSPECTION |
|
|
Signs posted last inspection report available
|
|
|
Floors, walls and ceilings: built, maintained, and
|
| 03/05/2010 - ROUTINE-INSPECTION |
|
|
Thermometers provided and accurate
|
|
|
Signs posted last inspection report available
|
|
|
Permits Available
|
| 12/29/2008 - ROUTINE-INSPECTION |
|
|
Food separated and protected
|
|
|
Warewashing facilities: installed, maintained, use
|
|
|
Premises personal/cleaning items vermin-proofing
|