04/01/2021
Inspection, Routine
|
01a - Critical |
Water Quality: Chemical Quality; Disinfection and pH |
Inspector Comments: The free chlorine available in both the pool and spa was 0 ppm.
|
01b - Critical |
Water Quality: Water Testing Equipment |
Inspector Comments: Several testing reagents were expired in the pump room. The facility had unexpired reagents available on site.
|
08a - Non-Critical |
Water Quality; Other: Water Quality; Other |
Inspector Comments: The calcium hardness for the pool was 50 ppm.
The saturation index of the pool was -.94.
|
09a - Non-Critical |
Deck Areas: Deck Areas |
Inspector Comments: Weir gates were not in place or in good working order on both the pool and the spa.
|
11a - Non-Critical |
Mechanical Room: Recirculation System, Piping, and Maindrains |
Inspector Comments: The flow meter for both the spa and pool was not functioning.
The vacuum gauge on the spa raw water line was not functioning and the vacuum gauge on the pool raw water line was missing.
|
11b - Non-Critical |
Mechanical Room: Filters |
Inspector Comments: A sight glass on the backwash line of both the pool and spa was not available.
|
14c - Non-Critical |
Records and Certifications: Chemical Records Maintained |
Inspector Comments: The disinfectant level and pH was not recorded 3 times a day for both the pool and spa.
The water temperature was not recorded every 2 hours for the spa.
The Saturation index, total alkalinity, and calcium hardness were not record daily for both the pool and spa.
The cyanuric acid levels were not recorded weekly for both the pool and spa.
|
14d - Non-Critical |
Records and Certifications: CPO or Approved Certification |
Inspector Comments: A Certified Pool Operator (CPO) was not on staff.
|
03/12/2020
Inspection, Routine
|
08a - Non-Critical |
Water Quality; Other: Water Quality; Other |
Inspector Comments: The free chlorine residual in the spa was above 5.0ppm.
|
09a - Non-Critical |
Deck Areas: Deck Areas |
Inspector Comments: Weir gates were not present in the swim pool or spa.
|
11a - Non-Critical |
Mechanical Room: Recirculation System, Piping, and Maindrains |
Inspector Comments: The flow meter for the spa and swim pool pump systems were non functioning.
|
11b - Non-Critical |
Mechanical Room: Filters |
Inspector Comments: The pressure gauges on the sand filter of the spa and swim pool pump systems were not in working order.
|
14c - Non-Critical |
Records and Certifications: Chemical Records Maintained |
Inspector Comments: The pH and free chlorine residual were not checked three times a day. The combined chlorine, total alkalinity, calcium hardness, flow meter reading, and saturation index were not checked daily.
|
14d - Non-Critical |
Records and Certifications: CPO or Approved Certification |
Inspector Comments: A certified pool operator was not available to the facility.
|
03/21/2019
Inspection, Routine
|
08a - Non-Critical |
Water Quality; Other: Water Quality; Other |
Inspector Comments: The pool chlorine was 5.8ppm. The pool combined chlorine was 2.0ppm. The spa combined chlorine was 1.2ppm. The spa calcium hardness was 125ppm. The pool cyanuric acid was greater than 100.
|
09a - Non-Critical |
Deck Areas: Deck Areas |
Inspector Comments: Weir gates were not provided on the pool or spa skimmers.
|
11a - Non-Critical |
Mechanical Room: Recirculation System, Piping, and Maindrains |
Inspector Comments: Spa flow meter was not functioning.
|
11b - Non-Critical |
Mechanical Room: Filters |
Inspector Comments: A sight glass was not provided on the spa sand filter.
|
03/08/2018
Inspection, Routine
|
01b - Critical |
Water Quality: Water Testing Equipment |
Inspector Comments: Several chemical bottles were expired.
|
09a - Non-Critical |
Deck Areas: Deck Areas |
Inspector Comments: Weir gates were not provided on all skimmers.
|
11a - Non-Critical |
Mechanical Room: Recirculation System, Piping, and Maindrains |
Inspector Comments: A schematic drawing was not provided in the pump room.
|
14b - Non-Critical |
Records and Certifications: Turnover Requirements |
Inspector Comments: The spa turnover rate was 40 minutes, as opposed to the required, 30 minutes.
|
09/07/2016
Inspection, Routine
|
08a - Non-Critical |
Water Quality; Other: Water Quality; Other |
Inspector Comments: Calcium hardness was less than the required 150-600ppm.
|
11a - Non-Critical |
Mechanical Room: Recirculation System, Piping, and Maindrains |
Inspector Comments: The spa flow meter was not functioning.
|
14c - Non-Critical |
Records and Certifications: Chemical Records Maintained |
Inspector Comments: The pool and spa were only being checked once a day. The facility was not recording the saturation index, the calcium hardness, the flow rate or the alkalinity once a day.
|
07/21/2015
Inspection, Routine
|
316 - Minor |
Color coded pipes & arrows; guages & flow meter installed; schematic diagram posted, instructions |
Inspector Comments: A schematic diagram of the pump room was not available.
|
318 - Minor |
Floor dry; no unnecessarry equipment, chemicals; no unauthorized persons |
Inspector Comments: The floor of the pump room had standing water.
|
37 - Minor |
Handrails, ladders, steps, stairs provided; tread non-slip, color contrasting; starting blocks |
Inspector Comments: The handrails for the pool steps and ladder were loose.
|
416j - Major |
Disinfection provided, maintained, proper handling of chemicals:Absorbant chemical containers stored |
Inspector Comments: A bag of powder calcium chloride was being stored on the floor in the chemical storage closet.
|
474 - Major |
Chemical parameters ( Free Chlorine and/or pH) must be within required range; immediate closure |
Inspector Comments: The chlorine level in the spa (.2) was below the required .4. The spa pH (7.0) was not between 7.2-8.0.
|
475 - Minor |
Pool chemical parameters must be within required range |
Inspector Comments: The spa alkalinity (220) was not between 70-180.
|
49 - Minor |
CPO or equivalent; water quality records available; tested at proper frequency; turnover |
Inspector Comments: The facility does not have a CPO on staff or under contract.
|
03/13/2014
Inspection, Routine
|
316 - Minor |
Color coded pipes & arrows; guages & flow meter installed; schematic diagram posted, instructions |
Inspector Comments: The pump room did not provide a schematic drawing of the pumping systems.
|
318 - Minor |
Floor dry; no unnecessarry equipment, chemicals; no unauthorized persons |
Inspector Comments: The floor of the pump room was wet.
|
474 - Major |
Chemical parameters ( Free Chlorine and/or pH) must be within required range; immediate closure |
Inspector Comments: The spa temperature was 106°F, as opposed to the required, 77°F-104°F. Bromine in the spa was 1.125ppm, as opposed to the required, 2ppm -10ppm bromine. The calcium hardness for the pool and the spa was 80ppm and 60ppm, respectively, as opposed to the required, 150-600ppm.
|
49 - Minor |
CPO or equivalent; water quality records available; tested at proper frequency; turnover |
Inspector Comments: Chemicals in the pool were not being tested three times a day. Chemicals in the spa were not being tested every two hours.
|